The commissioning of the 1 GeV Duke Storage Ring began in November, 1994 with the demonstration of injection, storage and ramping to 1 GeV at the first attempt. The ring is now operational. The Duke project is unique in that the storage ring and linac were designed, constructed and commissioned by a small new University laboratory, operating on a low budget. The team is comprised of six accelerator physicists and graduate students, eight engineers, and fifteen technicians.

Original languageEnglish
Pages213-215
Number of pages3
StatePublished - 1995
EventProceedings of the 1995 16th IEEE Particle Accelerator Conference. Part 1 (of 5) - Dallas, TX, USA
Duration: May 1 1995May 5 1995

Conference

ConferenceProceedings of the 1995 16th IEEE Particle Accelerator Conference. Part 1 (of 5)
CityDallas, TX, USA
Period05/1/9505/5/95

Cite this