Skip to main navigation Skip to search Skip to main content

Cost performance analysis in multi-level tree networks

  • Stony Brook University

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

2 Scopus citations

Abstract

A monetary network cost problem involving a homogeneous multi-level tree of processors and links is discussed. The monetary network cost of processing a divisible load, which is linearly dependent on the amount of divisible workload, is basically composed of a communication cost and a computing cost. A monetary network analysis is performed by aggregating the network speed parameters and network cost parameters. This allows one to obtain a closed form solution for the total monetary network cost with maintaining a minimum total parallel processing finish time. Through a mathematical derivation of the ratio of total computing time variation to total network cost variation against changes in network size, insights on trends of network performance against network cost are achieved.

Original languageEnglish
Title of host publication2010 9th International Symposium on Parallel and Distributed Computing, ISPDC 2010
Pages41-48
Number of pages8
DOIs
StatePublished - 2010
Event9th International Symposium on Parallel and Distributed Computing, ISPDC 2010 - Istanbul, Turkey
Duration: Jul 7 2010Jul 9 2010

Publication series

Name9th International Symposium on Parallel and Distributed Computing, ISPDC 2010

Conference

Conference9th International Symposium on Parallel and Distributed Computing, ISPDC 2010
Country/TerritoryTurkey
CityIstanbul
Period07/7/1007/9/10

Keywords

  • Cost efficiency
  • Divisible load theory
  • Multi-level tree
  • Network cost

Fingerprint

Dive into the research topics of 'Cost performance analysis in multi-level tree networks'. Together they form a unique fingerprint.

Cite this