TY - JOUR
T1 - Design of an Efficient, High-Throughput Photomultiplier Tube Testing Facility for the IceCube Upgrade
AU - The IceCube Collaboration
AU - Halve, Lasse
AU - Werthebach, Johannes
AU - Abbasi, R.
AU - Ackermann, M.
AU - Adams, J.
AU - Aguilar, J. A.
AU - Ahlers, M.
AU - Ahrens, M.
AU - Alispach, C.
AU - Alves, A. A.
AU - Amin, N. M.
AU - An, R.
AU - Andeen, K.
AU - Anderson, T.
AU - Anton, G.
AU - Argüelles, C.
AU - Ashida, Y.
AU - Axani, S.
AU - Bai, X.
AU - Balagopal, A. V.
AU - Barbano, A.
AU - Barwick, S. W.
AU - Bastian, B.
AU - Basu, V.
AU - Baur, S.
AU - Bay, R.
AU - Beatty, J. J.
AU - Becker, K. H.
AU - Becker Tjus, J.
AU - Bellenghi, C.
AU - BenZvi, S.
AU - Berley, D.
AU - Bernardini, E.
AU - Besson, D. Z.
AU - Binder, G.
AU - Bindig, D.
AU - Blaufuss, E.
AU - Blot, S.
AU - Boddenberg, M.
AU - Bontempo, F.
AU - Borowka, J.
AU - Böser, S.
AU - Botner, O.
AU - Böttcher, J.
AU - Bourbeau, E.
AU - Bradascio, F.
AU - Braun, J.
AU - Bron, S.
AU - Brostean-Kaiser, J.
AU - Kiryluk, J.
N1 - Publisher Copyright:
© Copyright owned by the author(s).
PY - 2022/3/18
Y1 - 2022/3/18
N2 - The IceCube Upgrade is an extension of the IceCube detector at the geographic South Pole. It consists of seven new strings with novel instrumentation. More than 430 multi-PMT optical modules called "mDOMs", housing 24 3-inch PMTs each, will be produced for the Upgrade. This will require testing and pre-calibration on a short timescale of more than 10,000 PMTs prior to assembly and deployment. We present the design of a PMT testing facility that enables simultaneous testing of roughly 100 PMTs per day at temperatures down to -20°C. The design is implemented at RWTH Aachen University and TU Dortmund University in parallel to achieve a throughput of up to 1,000 PMTs per week. This will enable a steady supply of tested PMTs to the production sites, which is critical for the Upgrade, as well as the future IceCube-Gen2 project.
AB - The IceCube Upgrade is an extension of the IceCube detector at the geographic South Pole. It consists of seven new strings with novel instrumentation. More than 430 multi-PMT optical modules called "mDOMs", housing 24 3-inch PMTs each, will be produced for the Upgrade. This will require testing and pre-calibration on a short timescale of more than 10,000 PMTs prior to assembly and deployment. We present the design of a PMT testing facility that enables simultaneous testing of roughly 100 PMTs per day at temperatures down to -20°C. The design is implemented at RWTH Aachen University and TU Dortmund University in parallel to achieve a throughput of up to 1,000 PMTs per week. This will enable a steady supply of tested PMTs to the production sites, which is critical for the Upgrade, as well as the future IceCube-Gen2 project.
UR - https://www.scopus.com/pages/publications/85145018253
M3 - Conference article
AN - SCOPUS:85145018253
SN - 1824-8039
VL - 395
JO - Proceedings of Science
JF - Proceedings of Science
M1 - 1056
T2 - 37th International Cosmic Ray Conference, ICRC 2021
Y2 - 12 July 2021 through 23 July 2021
ER -