Skip to main navigation Skip to search Skip to main content

Duke FEL Lab Storage Ring arc vacuum system upgrade

  • Duke University

Research output: Contribution to conferencePaperpeer-review

Abstract

The Duke FEL Lab Storage Ring vacuum system has provided reliable UHV operation since commissioning in 1994. Upgrade of the vacuum system is now in progress. Completion of crotch absorber installation will now allow full power operation (1 Amp @ 1 GeV). Since high power operation will increase the gas load in the ares, additional pumping will be required to maintain (and improve) the beam lifetime. To meet this demand we are planning to install TSP modules and bakeout the arc chambers this fall.

Original languageEnglish
Pages2171-2173
Number of pages3
StatePublished - 2001
Event2001 Particle Accelerator Conference - Chicago, IL, United States
Duration: Jun 18 2001Jun 22 2001

Conference

Conference2001 Particle Accelerator Conference
Country/TerritoryUnited States
CityChicago, IL
Period06/18/0106/22/01

Cite this