Abstract
Over-optimistic execution has long been identified as a major performance bottleneck in Time Warp based parallel simulation systems. An appropriate throttle or control of optimism can improve performance by reducing the number of rollbacks. However, the design of an appropriate throttle is a difficult task, as correct computations on the critical path may be blocked, thus increasing the overall execution time. In this paper we build a cost model for throttled execution that involves both rollback probability and probability for an event computation being on the critical path. The model can estimate an appropriate size of time window for a throttled execution using statistics collected from the purely optimistic execution. The model is validated by an experimental study with a set of synthetic workloads.
| Original language | English |
|---|---|
| Pages | 186-189 |
| Number of pages | 4 |
| DOIs | |
| State | Published - 1996 |
| Event | Proceedings of the 1996 10th Workshop on Parallel and Distributed Simulation, PADS - Philadelphia, PA, USA Duration: May 22 1996 → May 24 1996 |
Conference
| Conference | Proceedings of the 1996 10th Workshop on Parallel and Distributed Simulation, PADS |
|---|---|
| City | Philadelphia, PA, USA |
| Period | 05/22/96 → 05/24/96 |
Fingerprint
Dive into the research topics of 'Estimating the cost of throttled execution in time warp'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver