TY - GEN
T1 - Sample complexity of power system state estimation using matrix completion
AU - Comden, Joshua
AU - Colombino, Marcello
AU - Bernstein, Andrey
AU - Liu, Zhenhua
N1 - Publisher Copyright:
© 2019 IEEE.
PY - 2019/10
Y1 - 2019/10
N2 - In this paper, we propose an analytical framework to quantify the amount of data samples needed to obtain accurate state estimation in a power system - a problem known as sample complexity analysis in computer science. Motivated by the increasing adoption of distributed energy resources into the distribution-level grids, it becomes imperative to estimate the state of distribution grids in order to ensure stable operation. Traditional power system state estimation techniques mainly focus on the transmission network which involve solving an overdetermined system and eliminating bad data. However, distribution networks are typically underdetermined due to the large number of connection points and high cost of pervasive installation of measurement devices. In this paper, we consider the recently proposed state-estimation method for underdetermined systems that is based on matrix completion. In particular, a constrained matrix completion algorithm was proposed, wherein the standard matrix completion problem is augmented with additional equality constraints representing the physics (namely power-flow constraints). We analyze the sample complexity of this general method by proving an upper bound on the sample complexity that depends directly on the properties of these constraints that can lower number of needed samples as compared to the unconstrained problem. To demonstrate the improvement that the constraints add to state estimation, we test the method on a 141-bus distribution network case study and compare it to the traditional least squares minimization state estimation method.
AB - In this paper, we propose an analytical framework to quantify the amount of data samples needed to obtain accurate state estimation in a power system - a problem known as sample complexity analysis in computer science. Motivated by the increasing adoption of distributed energy resources into the distribution-level grids, it becomes imperative to estimate the state of distribution grids in order to ensure stable operation. Traditional power system state estimation techniques mainly focus on the transmission network which involve solving an overdetermined system and eliminating bad data. However, distribution networks are typically underdetermined due to the large number of connection points and high cost of pervasive installation of measurement devices. In this paper, we consider the recently proposed state-estimation method for underdetermined systems that is based on matrix completion. In particular, a constrained matrix completion algorithm was proposed, wherein the standard matrix completion problem is augmented with additional equality constraints representing the physics (namely power-flow constraints). We analyze the sample complexity of this general method by proving an upper bound on the sample complexity that depends directly on the properties of these constraints that can lower number of needed samples as compared to the unconstrained problem. To demonstrate the improvement that the constraints add to state estimation, we test the method on a 141-bus distribution network case study and compare it to the traditional least squares minimization state estimation method.
UR - https://www.scopus.com/pages/publications/85076425218
U2 - 10.1109/SmartGridComm.2019.8909815
DO - 10.1109/SmartGridComm.2019.8909815
M3 - Conference contribution
AN - SCOPUS:85076425218
T3 - 2019 IEEE International Conference on Communications, Control, and Computing Technologies for Smart Grids, SmartGridComm 2019
BT - 2019 IEEE International Conference on Communications, Control, and Computing Technologies for Smart Grids, SmartGridComm 2019
PB - Institute of Electrical and Electronics Engineers Inc.
T2 - 2019 IEEE International Conference on Communications, Control, and Computing Technologies for Smart Grids, SmartGridComm 2019
Y2 - 21 October 2019 through 23 October 2019
ER -