Abstract
An ampere class 20 MeV superconducting Energy Recovery Linac (ERL) is presently under commissioning at Brookhaven National Laboratory (BNL) for testing of concepts relevant for high-energy coherent electron cooling and electron-ion colliders [1]. The injector subsystems tests and installation were finished in fall 2013. The injector includes: SRF photoelectron gun with 1 MW amplifier, 10W green drive-laser system, multialkaline cathode deposition system, cathode transport system, beam instrumentation and control. First beam test conducted in June 2014 only dark current observed during first beam test [2]. The first photo current from ERL SRF gun has been observed in fall 2014 after second attempt [3]. The ERL returning loop components installed. New cathode with Ta tip conditioned. QE 4% observed. Bunch charge 0.55 nC achieved with new cathode. After ERL commissioning in BLDG 912 the ERL will be relocated to RHIC IP2 to be used for LEReC.
| Original language | English |
|---|---|
| Title of host publication | ERL 2015 - Proceedings of the 56th ICFA Advanced Beam Dynamics Workshop on Energy Recovery Linacs |
| Publisher | Joint Accelerator Conferences Website (JACoW) |
| Pages | 10-14 |
| Number of pages | 5 |
| ISBN (Electronic) | 9783954501830 |
| State | Published - Dec 1 2015 |
| Event | 56th ICFA Advanced Beam Dynamics Workshop on Energy Recovery Linacs, ERL 2015 - Stony Brook, United States Duration: Jun 7 2015 → Jun 12 2015 |
Publication series
| Name | ERL 2015 - Proceedings of the 56th ICFA Advanced Beam Dynamics Workshop on Energy Recovery Linacs |
|---|
Conference
| Conference | 56th ICFA Advanced Beam Dynamics Workshop on Energy Recovery Linacs, ERL 2015 |
|---|---|
| Country/Territory | United States |
| City | Stony Brook |
| Period | 06/7/15 → 06/12/15 |
Fingerprint
Dive into the research topics of 'Status and commissioning results of the R&D ERL at BNL'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver